Lane Closure MOT Plans
Temporary lane closures, shifts and taper transitions designed for the specific roadway, traffic movements and construction footprint.
Engineer-prepared FDOT-informed Maintenance of Traffic plans for lane closures, sidewalk closures, utilities and contractor work zones in Fort Myers and the surrounding Lee County area.
We support contractor requests for utility cuts, lane shifts and local-road work. Every design starts with the actual work area and the permit jurisdiction.
Temporary lane closures, shifts and taper transitions designed for the specific roadway, traffic movements and construction footprint.
Pedestrian routing and temporary sidewalk closures evaluated against existing routes and applicable accessibility requirements.
Advance warning, temporary detours, local access and traffic control arrangements for work requiring road occupancy.
Work-zone layouts for underground utilities, equipment setup, crane activity and other short- or long-duration projects.
Construction staging should reflect roadway operating conditions and how adjacent properties stay accessible.
Projects may fall under Fort Myers city streets, Lee County roadways and FDOT facilities. We confirm the road authority and applicable agency standards from the location and permit details rather than assuming one standard covers every street.
Most routine plans can be prepared within 24–48 hours once we have the information we need, subject to complexity and schedule confirmation.
Share the address, affected lanes or sidewalks, dates, equipment and any agency comments.
We review the site conditions and prepare project-specific MOT plan sheets.
Use the plan for the permit application. We address review comments within the agreed scope.
Yes. We first review the lane geometry, shift width, speed and intended traffic operations.
Design revisions within the agreed scope are included; changes to the underlying work scope may require a separate fee.
Get an engineering quote based on your site, work duration and closure configuration — no approval guarantee or invented permit timeline.